60/10kV station in Midtjylland.
Customer: EL: CON.
Design and commissioning of 60/10kV substation in Midtjylland. Circuit schemes and switchboard drawings have been prepared by ETP Consult AS. ETP Consult had supervision during the commissioning. Everything went according to plan.
